Engineering Case Display Episode 3-Kallang Football Facility Structural components-Yuantai Derun Steel Pipe Group

Today, the editor has brought you the third episode of our engineering case presentation from Yuantai Derun Steel Pipe Manufacturing Group - Kalling Football Facility Structural Components.

Project Name: Kallang Football Facility Structural Components
Standard: EN10210 S355J0H
Round tube: 60.3 * 5 to 273 * 12mm
Square tube: 50 * 50 * 5 to 250 * 250 * 16mm
Rectangular tube: 50 * 100 * 5 to 200 * 300 * 16mm
500 tons in total

Kallang Football Facility Structural components-Yuantai Derun Project Case

Yuantai Derun Main Products

Square steel pipe: 10 * 10-1000 * 1000mm Wall thickness: 0.5-60mm Length: 0.5-24 meters
Rectangular steel pipe: 10 * 15-800 * 1200mm Wall thickness: 0.5-60mm Length: 0.5-24 meters
Circular steel pipe: 10.3-3000mm Wall thickness: 0.5-60mm Length: 0.5-50 meters
Steel pipe coating: oil coating, spray painting, hot dip galvanizing, galvanized aluminum magnesium, etc
Welding method: ERW, LSAW, SSAW, Seamless
Settlement method: TT, LC
Freight time: ranging from 7 to 60 days

Contact information:

Mobile: 8613682051821

WhatsApp: 8613682051821

Email: sales@ytdrgg.com


Post time: Jun-06-2023